Today the volunteers were threading through the new cable for the electrics in the facilities at the end of the 1870s building. The crane came in handy again to suspend the large wooden drum of cable so it could be unrolled and threaded under the metal floor trays in the 1960s building. It took six of them to make it all happen, wrestle the cable from the drum and thread it under the floor. Chris R was then able to connect it up to the distribution board in the 1870s building and leave some spare cable as positioning in the future may change.