Tiling the floor

Volunteers are now working on tiling the holes left in the floor after the removal of the pump plinths. It was agreed with the conservation officer that the footprints of the plinths and also the four motor controls would be tiled with red tiles to identify these locations. Other areas of the floor are being repaired with original tiles that have been salvaged from other work.

Leave a Reply

Your email address will not be published. Required fields are marked *